Tel: 0435 795 337 | Fax: 07 3868 3206 | Postal Address: 52 Childs Road Nudgee Brisbane Q4014
Wyaralong Dam

Wyaralong Dam

James Bonner marking artifacts in Wyaralong testpit. Group excavation work in Wyaralong testpit. Rare blade found in Wyaralong testpit. Wyaralong Dam Background to the Project Queensland Water Infrastructure Pty Ltd (QWI) is proposing the development of Wyaralong Dam...
Springfield Rail Corridor

Springfield Rail Corridor

The test pitting process as used by Jagera Daran, shown here at QR Test Pit 2. Left to right: Dan Jones, Henry Bonner (JD); Mike Seaman (TrackStar Logistics Officer) Excavation of Test Pit 1. Jagera Daran team undertaking initial investigation Test pit nearing...
MTAA Flagstone

MTAA Flagstone

Michael Strong (Turnstone Archaeology); Bill Bonner, Matt Farqherson, George Martin, Shane Bonner, James Bonner (JD); Earl van Nickert, Ricky Graham (MTAA). Earl van Nickert and Red Bonner sieving the spoil heap to recover backed blade manufacturing debitage. Some of...
Gatton Correctional Centre

Gatton Correctional Centre

Jagera Daran cultural team examining surface finds from the silcrete deposit. L-r. James Bonner (Jagera Daran Project Manager), Bob Elder (JD Site Manager) and Ken Bonner (Jagera Elder).   Test Trench 12, Zone 6, Camira Left to right: Bernie Brown, Henry Bonner,...